Tag Archives: canal st

Wacker Drive Concrete Pour to Impact Traffic Friday

More than 100 concrete trucks will assemble Friday, Aug. 26 on and nearby north-south Wacker Drive to pour a deck between Washington Street and Madison Street as part of the Revive Wacker Drive, Part 2 reconstruction project. The deck pour will impact pedestrian and vehicular traffic throughout the day and into Saturday morning. Site preparation to allow access for the concrete trucks south of Washington Street will begin at 9:30 a.m. As a result, the south crosswalk at Wacker Drive and Washington Street will be closed to pedestrians. All pedestrians will be directed to cross Wacker Drive on the north …
Read the rest of this entry

Posted in Businesses, CTA, Pedestrians, traffic | Tagged , , , , , , , ,